demolition
open

Interior Demolition — 2nd-Floor Bathroom Gut

Posted Aug 15, 2026by Meredith Lockemeredith.locke@example.com
Budget
$550–$850
Deadline
-
Bids
0
Full gut of a 55 sq ft second-floor bathroom in a Ghent rowhouse. Remove tub, toilet, vanity, tile floor, and all drywall down to studs. Protect adjacent hallway hardwoods with poly + ram board. Water is shut off; owner has bagged the toilet trap. All debris to curb — city bulk pickup Friday.
Install American Laborers
Book crews, track jobs, get instant push alerts. One tap. No app store.